Is this not convincing ?
Time and costs saving
Alphasoil®-06 replaces due to unique physical properties the thick stones substructure of the roads. It uses the local soil and enables the construction of a conventional road within few days reflecting a significant saving of materials e.g. wagon, depot and staff and much more faster construction time enabled through modified work shedule.
Even during rainfall, and under certain conditions, when using Alphasoil®-06 the work still possible and does not to be ceased.
And the soil treated with the Alphasoil®-06 can be used for flood barrier!
The common problem of Softening of untreated soil practically eliminated with Alphasoil®-06, achieving a water penetration value of KF 10 Exp 10 makes it impossible, hence, a dam break though is effectively prevented!
Futhermore,with Alphasoil®-06-System constructed railway lines are well illegible for high speed trains.
Advisors and satisfied developers
and well literate construction engineers testified, that there is no risk using Alphasoil®-06
Environmental report reased from a well acknowledged research institute in addition to testifying customers in the recent years. Confirm the positive result of the application of Alphasoil®-06 in practice. Neither the owners nor the construction companies are exposed to any risk when using Alphasoil®-06. Alphasoil®-06 is a reliable product and effective, guaranteed by the manufacturer, if applied correctly.
